Friday, May 15, 2026

Weekly Area Road Work for May 20th, 2026

Daviess County

Route 13 – Resurfacing and ADA improvements project from Berry Street to Van Buren Street in Gallatin through June 2026. Route 13 will be narrowed to one lane with flaggers. (Contractor: Herzog Contracting Corp.)

Route K – CLOSED for culvert replacement north of Route P junction, May 21, 7:30 a.m. to 2 p.m.

Route 6 – Shoulder work eastbound 2 miles east of Gallatin on the south side of the roadway, May 19-20, 7:30 a.m. to 2 p.m.

Nodaway County

Route 113 – Various bridge rehabilitation projects through May 2026. The bridges may be narrowed to one lane with flaggers. (Contractor: Capital Paving & Construction LLC). *2  

U.S. Route 71 – Resurfacing project from the Iowa state line to U.S. Route 136 near Burlington Junction through August 2026. The road will be narrowed to one lane, and a 10-foot width restriction will be in place.

U.S. Route 136 – Resurfacing project from I-29 to U.S. Route 71 through August 2026.The road will be narrowed to one lane, and a 10-foot width restriction will be in place.

Route U – CLOSED around-the-clock for a crossover improvement project at the U.S. Route 71 crossover between north and southbound lanes of Route 71, May 18-22.

S. Route 71 will be narrowed to one lane in both directions at Route U around-the-clock.

Route E – CLOSED for a culvert replacement from 120th Street to 130th Street, May 18-19, 7 a.m. to 3 p.m. daily.

Route E – CLOSED for a culvert replacement from 100th Street to 120th Street, May 21-22, 7 a.m. to 3 p.m. daily.

 

No comments: