Harrison County
I-35 – Resurfacing project from the Iowa state line to Route N near Eagleville through October 2026. An 11-foot width restriction will be in place. (Contractor: Emery Sapp & Sons)
Nodaway County
U.S. Route 71 – Intersection improvement project at 340th Street through early November 2026. (Contractor: Leavenworth Excavating & Equipment Company, Inc.) https://www.modot.org/projects/us-route-71-j-turn-installation-nodaway-county
U.S. Route 71 – Resurfacing project from the Iowa state line to Route CC north of Maryville through October 2026. The road may be narrowed to one lane, and a 10-foot width restriction will be in place.
U.S. Route 46 – Resurfacing project from U.S. Route 59 to Nodaway River through late October. The road may be narrowed to one lane with an 11-foot width restriction. (Contractor: Herzog Contracting Corp.)
U.S. Route 136 – Resurfacing project from I-29 to Route 71, east of the Burlington Junction. The road will may be narrowed to one lane, with an 11-foot width restriction. (Contractor: Herzog Contracting Corp.)
Route E – Resurfacing project from the Iowa state line to U.S. Route 136 through October 2026. The road may be narrowed to one lane, with a 10-foot width restriction in place. (Contractor: Herzog Contracting Corp.)
Route EE – Resurfacing project from Route NN to U.S. Route 136 through October 2026. The road will be narrowed to one lane, with a 10-foot width restriction in place. (Contractor: Herzog Contracting Corp.)
Route VV – CLOSED for a deck replacement project at the Platte River Bridge through December 2026. (Contractor: Louis-Company, LLC) https://www.modot.org/projects/route-vv-bridge-replacement-nodaway-county
Route FF – CLOSED for pothole patching from Route JJ to 140th Street, Oct. 13, 8 a.m. to 3 p.m.
Route B – Pothole patching from Route FF to Imperial Road, Oct. 13.
No comments:
Post a Comment