Sunday, June 1, 2025

North Nodaway Quarterly Awards for May 2025

GOLD HONOR ROLL

6th Grade — Kayden Snuffer.

7th Grade — Sophee Clapp, Zoey Pearson.

8th Grade — Conner Pearson.

9th Grade — Laney Turner.

10th Grade — Lily Blane, Mya Hansen, Ridge Harger, Tequilla Miller.

11th Grade — Addalea Barcus.

12th Grade — Owen Martin, Olivia Renfro.

SILVER HONOR ROLL

6th Grade — Arianna Owens, Kamden Reynolds, Avary Volner.

7th Grade — Reed Martin, Cade Miller, Ava Steinman, Gannon Stricker.

8th Grade — Eliza Clements, Luke Clements, Jaycie Edington, Journi Farnsworth, Jackson Keho, Hayden Marriott, Zoey Phillips, Marek Stevens.

9th Grade — Trynzlee Ebrecht, Taccoa Moyer, Draven Rader, Lena Richards, Savannah Rucker, Pyper Smith.

10th Grade — Wyatt Emery, Keith Riedel.

11th Grade — Sadee Clapp, Emily Keho, Kaeden Nave, Lacy Riley, Draven Rowland, Gannon Volner, Trevin Wyllie.

12th Grade — Kody Bird, Mason Casner, Nevaeh Halvin, Gabryelle Harper, Katelyn Parman, Amy Richards, Lakota Rucker, Nevaeh Smith.

BRONZE HONOR ROLL

6th Grade — Braxton Dougherty, Jacobie Edington.

7th Grade — Samuel Jenkins, Chandra Wyllie.

8th Grade — Owen Coleman, Elijah Tatum.

9th Grade — Weston Alexander, Kaeah Edington, Robbie Forney.

10th Grade — Monica Castillo, Aiden James.

11th Grade — Blaine Clements, Jordan DeLeon, Casey Wray, Jackie Wray.

PERFECT ATTENDANCE

6th Grade — Carter Forney, Brentley Marriott, Arianna Owens, Kayden Snuffer.

7th Grade — Scarlett Brown, Kayden Clements, Reed Martin, Trenton Roberts, Ava Steinman, Tristen Wray.

8th Grade — Hayden Marriott, Elijah Tatum.

9th Grade — Draven Rader, Savannah Rucker, Pyper Smith.

11th Grade — Lacy Riley.

12th Grade — Owen Martin, Olivia Renfro.

Perfect Attendance for Year — Savannah Rucker, Lacy Riley.

OTHER AWARDS

Middle School Achievement — Israel Torres.

Middle School Leadership — Dustie Rader.

Middle School Mustang — Marek Stevens.

Student of the Quarter — Zoey Pearson.

High School Achievement — Conner Reeves (9th), Keith Riedel (10th), Kaeden Nave (11th).

High School Leadership — Gannon Volner.

High School Citizenship — Jordan DeLeon.

Student of the Quarter — Lacy Riley.

 

Free Fishing Days June 7th and 8th

Brandon Lyddon, Conservation Agent

The Missouri Department of Conservation (MDC) invites the public to get hooked on fishing through its Free Fishing Days June 7 and 8, 2025. Each year MDC designates the weekend after the first Monday in June for permit-optional fishing. The goal of Free Fishing Days is to encourage people to sample the state's abundant fishing opportunities. During Free Fishing Days, anyone can fish in the Show-me State without having to buy a fishing permit, trout stamp or trout park daily tag.

Other regulations, such as limits on size and number of fish an angler can keep, remain in effect during Free Fishing Days. Regulations are outlined in the 2025 Summary of Missouri Fishing Regulations Booklet and are available where fishing permits are sold, MDC offices, or online at www.mdc.mo.gov. Fishing permits are required for public water fishing (except on June 7 and 8, 2024), and can be purchased at vendors across Missouri, through the MDC MO Hunting permit app, or online.

MDC has many conservation areas with lakes and ponds to fish.  You can go to www.mdc.mo.gov to find information about fishing, conservation areas, maps, regulations, etc. Popular public waters in Northwest Missouri to fish are Mozingo Lake, Harrison County Lake, Pony Express Lake, Limpp Lake, Worth County Lake, Happy Holler Lake, Paho Lake, and Smithville Lake. Many state-owned fishing areas also have special facilities for anglers with disabilities.

 

Opinion -- Missouri Supreme Court Decision Victory for Life

By the Missouri Right to Life

The following statement is from Steve Rupp, President of Missouri Right to Life:

Missouri Right to Life welcomes the Missouri Supreme Court Decision on Tuesday, ordering a Jackson County judge to vacate the preliminary injunctions that she had entered earlier this year in which she declared the Missouri abortion ban and all of Missouri's health and safety regulations unconstitutional under Amendment 3.

This decision will save lives of preborn babies and the health and safety of Missouri Women.  

Among the regulations that the judge had declared unconstitutional included requirements that:

—Only doctors perform abortions. 

—Surgical instruments be sterilized before use.

—Doctors examine the mother to determine the gestational age of the unborn child and to identify any medical risk before performing an abortion.

—Ultrasounds only be performed by licensed medical professionals.

—Abortion clinics have emergency trays and emergency supplies.

Doctors obtain informed consent prior to performing an abortion.

The Missouri Supreme Court's ruling came as a result of an appeal filed by Missouri Attorney General Andrew Bailey, utilizing the authority granted by the Missouri Right to Life backed Senate Bill 22, in which the Attorney General challenged the Jackson County preliminary injunctions.

The Missouri Supreme Court sent the case back to the Jackson County court with instructions to reevaluate Planned Parenthood's request for preliminary injunction based on several criteria, including if Planned Parenthood would suffer irreparable harm without the injunction and also to balance that harm with any injury that an injunction would inflict on other interested parties.

Planned Parenthood had previously stated in court filings that they could not comply with the health and safety standards listed above and after the ruling stated they were cancelling abortion appointments and would cease abortions, the killing of innocent unborn children, until further order of the court.

This is a great victory for life!

 

Bill Would Allow Farmers to Shoot Black Vultures Attacking Livestock

Senator Eric Schmitt (R-MO) helped introduce The Black Vulture Relief Act, which would amend the Migratory Bird Treaty Act to allow Missourians to take action against a black vulture when the bird is causing death, injury or destruction to livestock.

“Black vultures are a deadly species that have caused hundreds of thousands of dollars of damage to ranchers and producers across Missouri. These birds are native to Missouri and have seen their population grow by more than 450% since 1990. We must keep this dangerous bird population under control and allow ranchers and producers across the Show Me State the ability to do what they do best— feed our nation and the world,” said Senator Eric Schmitt.

“Predatory black vultures pose a serious threat to livestock in Missouri and across our nation. For too long, livestock producers have been burdened by red tape and bureaucracy when defending their farms. Missouri Farm Bureau is grateful to Senator Schmitt and his colleagues for leading the charge to give farmers the ability to protect their livestock when threatened. This is an important step in the right direction, and we look forward to working with our elected leaders to implement this commonsense reform to better serve farmers and ranchers,” said Garrett Hawkins, President of the Missouri Farm Bureau a farmer from St. Clair County.

“Missouri producers increasingly face the emotional and financial strain of cattle deaths due to the predatory black vultures. At a time when our state’s cattle numbers are at the lowest level since the 1950s, we cannot afford to have vultures killing newborn calves. Producers need to be able to protect their private property regardless of an international bird treaty signed 110 years ago. Thank God we have a U.S. Senator with commonsense who cares more about cattlemen than scavengers,” said Mike Deering, Missouri Cattlemen’s Association Executive Vice President.

The Black Vulture Relief Act will:

· Amend the Migratory Bird Treaty Act to allow a covered person (producer or employee of a producer) to take (capture, kill or disperse and transport carcass) a black vulture when…

· The vulture is causing, or that the covered person has a reasonable belief will cause, death, injury, or destruction to livestock.

· Cause injury to the bird in the course of taking or attempting to take a black vulture.

· Require producers file an annual report with their local FWS office on yearly takings, if the producer takes a vulture in the year.

I-35 Bridges Near Maysville, Eagleville to Close for Repair

The Missouri Department of Transportation has contracted Capital Paving & Construction, LLC to complete a bridge deck replacement project on the Daviess County Missouri Route 6 bridge over Interstate 35 near Altamont and the Harrison County Route N bridge over I-35 near Eagleville. The Route 6 bridge in Daviess County is scheduled to close beginning Monday, June 9.

Traffic Impacts: Route 6 (Exit 64): The bridge over I-35 will be closed June 9 through late August 2025. Motorists will not be able to cross the bridge. A detour will be in place directing traffic to use U.S. Route 69 (Exit 69 to the north and Exit 61 to the south).

Interstate 35 under the bridge will be closed overnight in both directions during demolition and traffic will be directed up and over the ramps at Route 6 (Exit 64) around the closure. More information will be shared once a closure date has been determined. 

The bridge deck replacement on the Harrison County Route N bridge near Eagleville is scheduled to begin in early September.

For more information about this project, visit: Missouri Route 6 and Route N Bridge Rehabilitation over Interstate 35 in Daviess and Harrison Counties | Missouri Department of Transportation.

All work is weather-permitting, and schedules are subject to change. MoDOT asks drivers to work with us by always buckling up, keeping your phones down, slowing down and moving over in work zones. Know before you go and check what work zones you might encounter at traveler.modot.org.

Get project and work zone news straight to your email by signing up for eUpdates. Information is also available 24/7 by calling 888-ASK-MODOT (275-6636) or visiting www.modot.org/northwest.

 

Weekly Area Road Work for June 2nd, 2025

The following is a list of general highway maintenance and construction work the Missouri Department of Transportation has planned in the Northwest Missouri region for the week of June 2-8.

There also may be moving operations throughout the region, in addition to the work mentioned below. Inclement weather may cause schedule changes in some of the planned work. Check the MoDOT Traveler Information Map at http://traveler.modot.org, or download the app for updated information.

MoDOT asks drivers to work with us by buckling up, putting your phone down, slowing down and moving over in work zones.

Andrew County

Interstate 29 – Resurfacing project from Business 71 to U.S. Route 59 (Holt County) through June 2025. (Herzog Contracting Corp.)

Route B – CLOSED for bridge deck replacement at the Upper Neely Bridge through June 2025 (Contractor: Capital Paving & Construction, LLC). https://www.modot.org/projects/route-b-route-dd-and-route-h-bridge-rehabilitation-andrew-and-buchanan

Route O – Pothole patching from County Road 290 to County Road 292, June 3.

Route DD – Pothole patching from Route T to U.S. Route 59, June 4.

Route C – Pothole patching from Route E to County Road 177, June 5.

Route 48 – Bridge rehabilitation project at the Platte River Overflow bridge, June 3. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC). *2

Route DD - Bridge rehabilitation project at the Dillon Creek Bridge, June 4. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC). *2

Route Y - Bridge rehabilitation project at the Owl Creek Bridge, June 4. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC). *2

Route H - Bridge rehabilitation project at the Arapahoe Creek Bridge, June 4. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC). *2

Atchison County

I-29 – Narrowed to one lane in each direction at the Mill Creek Bridges, south of Rock Port, for a bridge rehabilitation project through September 2025. (Contractor: Emery Sapp & Sons, Inc).

U.S. Route 59 – Resurfacing project from near the Iowa line to just south of U.S. Route 136 near Tarkio, June 2-4. (Contractor: Herzog Contracting Corp.)

Route 159 – Resurfacing project from Little Tarkio Creek to I-29 near Mound City through July 2025. (Contractor: Herzog Contracting Corp.)

Buchanan County

Route 752 (Alabama Street) – CLOSED from U.S. Route 59 to Sherman Street for an intersection improvement project through mid-August 2025. (Contractor: Amino Bros. Co., Inc.) https://www.modot.org/projects/route-u-missouri-route-59-and-missouri-route-752-intersection-improvements-buchanan-county

Route 6 – Scrub seal project, June 2-3. (Contractor: Vance Brothers, Inc.)

Route 116 - Bridge rehabilitation project at the Bee Creek and Little Bee Creek Bridges, June 5. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC). *2

Route M - Bridge rehabilitation project at the Sugar Creek Bridge, June 5. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC). *2

Route DD - Bridge rehabilitation project at the Malden Creek Bridge, June 6. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC). *2

Route H - Bridge rehabilitation project at Wolfpen Creek, June 6. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC). *2

Route P - Bridge rehabilitation project at the Third Fork Platte River Bridge, June 6. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC). *2

Route FF – Utilities/permit work from Riverside Terrance to Hillcrest Drive, June 2. The road will be narrowed to one lane with flaggers guiding motorists through the work zone.

Caldwell County

Route D – CLOSED for a bridge replacement project at the Shoal Creek Bridge through early August 2025. (Contractor: Cale Seymour Construction, LLC). https://www.modot.org/route-d-bridge-replacement-caldwell.

Carroll County

U.S. Route 65 – Pothole patching, June 2-6.

U.S. Route 65 – Resurfacing project from U.S. Route 36 in Chillicothe to south of Route CC near Carrollton, through October. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. A 12-foot width restriction will be in place. (Contractor: Capital Paving & Construction, LLC).

Route B – Bridge rehabilitation project at the Camp Creek Bridge, June 2-6. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC). *2

Chariton County

Route D – CLOSED at the Mussel Fork Creek Bridge for a bridge replacement project through July 2025. (Capital-Horner & Shifrin).*1

Route M – CLOSED for a culvert replacement at the intersection of Route 11, June 3, 7 a.m. to 3 p.m.

Clinton County

I-35 – Construction of crossovers and emergency pull-offs in preparation for a pavement rehabilitation project from Shoal Creek near the intersection of I-35 to Route 116 through mid-June 2025. (Contractor: Michels Road & Stone). https://www.modot.org/projects/interstate-35-and-us-route-69-concrete-overlay-clinton-county

U.S. Route 69 – Road widening and resurfacing project from Shoal Creek near the intersection of I-35 to Route 116 through June 2025. (Contractor: Michels Road & Stone).  https://www.modot.org/projects/interstate-35-and-us-route-69-concrete-overlay-clinton-county

Route NN - Bridge rehabilitation project at the McGuire Creek Bridge, June 6. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC). *2

Daviess County

Route 6 – Resurfacing project in Maysville through August 2025. (Contractor: Herzog Contracting Corp.)

DeKalb County

Route P and Route O – CLOSED through Clarksdale for permitted community event, June 7, 6 a.m. to 11 p.m.

Route A - Bridge rehabilitation project at the East Fork Lost Creek Bridge, June 2. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC). *2

Route H - Bridge rehabilitation project at the Dry Branch Bridge, June 2. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC). *2

Route E - Bridge rehabilitation project at the East Fork Lost Creek Bridge, June 2. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC). *2

Route E - Bridge rehabilitation project at the Lost Creek and Little Third Fork Platte River Bridge, June 3. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC). *2

Gentry County

Route EE – CLOSED for pothole patching, June 2-6, 8 a.m. to 3 p.m. daily.

Holt County

I-29 – Resurfacing from U.S. Route 59 north of the Nodaway River to Business 71 north of St. Joseph through July 2025. (Contractor: Herzog Contracting Corp.)

U.S. Route 59 – CLOSED beginning June 2 for a bridge deck replacement at the I-29 Bridge near Craig through mid-August 2025. (Contractor: Emery Sapp & Sons, Inc.) https://www.modot.org/projects/missouri-route-59-bridge-rehabilitation-atchison-and-holt

Route T – CLOSED for bridge deck replacement at the Mill Creek Bridge through September 2025. (Contractor: Emery Sapp & Sons, Inc.). https://www.modot.org/projects/missouri-route-59-bridge-rehabilitation-atchison-and-holt

Route B – CLOSED for bridge replacement project at the Hickory Creek Bridge through December 2025. (Contractor: North Central Bridge, LLC). https://www.modot.org/projects/route-b-bridge-replacement-holt-county

Route 113 – Pothole patching from U.S. Route 59 to Skidmore, June 2-6.

Route 113 – Scrub seal project, June 2-9. (Contractor: Vance Brothers, Inc.)

Linn County

U.S. Route 36 – Pavement repair project through June. A single lane may be closed in up to two-mile sections, around the clock, Monday through Friday. A 12-foot width restriction will be in place (Contractor: Realm Construction Inc.).

Livingston County

U.S. Route 65 – Resurfacing project through July. Crews will be repairing entrances and curbs in Chillicothe from Second Street to Business U.S. 36. (Contractor: Capital Paving & Construction, LLC).

U.S. Route 65 – Resurfacing project from U.S. Route 36 in Chillicothe to south of Route CC near Carrollton, through October. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. A 12-foot width restriction will be in place. (Contractor: Capital Paving & Construction, LLC).

Route D - Bridge rehabilitation project at the Old Channel Shoal Creek Bridge, June 2-6. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone. (Contractor: Capital Paving & Construction, LLC). *2

Nodaway County

Route NN – CLOSED for a bridge replacement project at the Platte River Bridge west of Parnell through October 2025. (Contractor: Louis-Company, LLC). https://www.modot.org/route-nn-bridge-replacement-nodaway.

Route 136 – Concrete replacement from Danube Road to Route PP. The road will be narrowed to one lane, June 2-6.

Route 113 – Scrub seal project, June 2-9. (Contractor: Vance Brothers, Inc.)

Route MM – CLOSED for pothole patching from 280th Street to 290th Street, June 3, 7 a.m. to 3 p.m.

Route AF – CLOSED for pothole patching from Panther Road to 420th Road, June 4-5, 7 a.m. to 3 p.m. daily.

Worth County

Route M – CLOSED for a bridge deck replacement at the East Fork Grand River Bridge through July 2025. (Contractor: Capital Paving & Construction, LLC). https://www.modot.org/projects/us-route-169-route-b-and-route-m-bridge-rehabilitation-gentry-and-worth

---

*1 This bridge is part of the NWBB (Northwest Bridge Bundle) program. The design-build team is Capital-Horner & Shifrin. More info: NWBB program web page.

*2 This bridge is part of the Safe and Sound Bridge Rehabilitation program. The contractor is Capital Paving & Construction, LLC. More info: Northwest Missouri Safe & Sound Bridge Rehabilitations | Missouri Department of Transportation.