Monday, August 14, 2023

Weekly Area Road Work for August 16th, 2023

Gentry County

Route YY – CLOSED until further notice at the Bear Creek Bridge due to deterioration. This bridge is included in a replacement project scheduled to be a part of the September 2023 letting for contractor bids. https://www.modot.org/atchison-and-gentry-counties-bridge-replacements

U.S. Route 136 – Resurfacing project from U.S. Route 169 to Route J (Nodaway County) through mid-August. A 12-foot width restriction is in place. (Contractor: Herzog Contracting Corp.)

Route E – CLOSED for a bridge replacement project at the Walnut Fork Bridge through early September. (Contractor: North Central Bridge, LLC) More info: https://www.modot.org/gentry-county-route-e-walnut-fork-bridge-replacement-project

Route T – CLOSED for a bridge replacement project at the Brushy Creek Bridge through October.*1

Route T – CLOSED for a bridge replacement project at the Fitzgerald Creek Bridge through mid-November.*1

Route A – CLOSED for a culvert replacement from 375th Street to 385th Street, Aug 15-17, 7:30 a.m. to 3 p.m. daily.

Harrison County

Route D – CLOSED for a bridge replacement project at the Ames Creek Bridge, west of Bethany, through early October.*1

Route D – Pavement repairs, Aug. 14-18.

Route U – Pavement repairs, Aug. 14-18.

U.S. Route 136 – Bridge maintenance at the bridge over Big Creek, Aug. 14-17. The bridge will be narrowed to one lane with temporary traffic signals to guide motorists through the work zone.

Route A – CLOSED for a bridge rehabilitation project, Aug. 14-18. *2

Nodaway County

U.S. Route 136 – Resurfacing project from Route J to U.S. Route 169 (Nodaway County) through mid-August. A 12-foot width restriction is in place. (Contractor: Herzog Contracting Corp.)

Route N – CLOSED for culvert replacements from Route VV to Route M, Aug. 14-15, 6:30 a.m. to 3 p.m. daily.

Route N – CLOSED for culvert replacements from Route M to Route B, Aug. 14-17, 6:30 a.m. to 3 p.m. daily.

Route FF – CLOSED for a sealing operation from Route B to U.S. Route 71, Aug. 14, 6 a.m. to 5 p.m.

Route AD – CLOSED for a sealing operation from Route B to Galaxy Road, Aug. 14, 6 a.m. to 5 p.m.

Ringgold County

Route 169 – State Line Bridge construction between Grant City and Redding. Road limited to one lane of traffic. Access controlled by traffic signal.

Route 25 – Construction from Route 2 through Clearfield to east of Lenox. Pilot car, flaggers in operation.

Route P27 – Road closed except for local traffic north of Redding to Route 2. Bridge construction.

Taylor County

Route 2 – Construction from Bedford to Route 25. Pilot car, flaggers in operation.

Worth County

Route A – CLOSED for a bridge replacement project at the Branch Bridge through early November.*1

Legend

*1 This bridge is part of the FARM (Fixing Access to Rural Missouri) Bridge Program. Contactor is Capital Paving Materials & Construction (formerly Lehman Construction Company). More info: FARM Bridge program web page

*2 This bridge is a part the Safe & Sound bridge rehabilitation project. Contractor is Capital Paving Materials & Construction. More info: https://www.modot.org/safe-sound-bridge-rehabilitations-buchanan-carroll-gentry-harrison-counties


No comments: